ITAC Assessment: UM0210
ITAC logo
ITAC Assessment: UM0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Wooden Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $50
M
to 100
M
# of Employees 405
Plant Area 483,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,539 8,380,800
kWh
Electricity Demand $143,188 24,384
kW-mo/yr
Electricity Fees $1,462 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $43,964 $148,000 $55,669
1,497,690
kWh
$12,045
-
kW-mo/yr
$(-13,750.0)
-
MMBtu
- $(-10,000.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,296 $45,826 n/a $11,296
302,840
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $4,037 $6,600 - - - $4,037
-
Tgal
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,984 $450 $2,620
70,484
kWh
$1,364
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $778 $900 $621
16,700
kWh
$157
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $64,059 $201,776 $70,206
1,887,714
kWh
$13,566
-
kW-mo/yr
$(-13,750.0)
-
MMBtu
$4,037
-
Tgal
$(-10,000.0)
TOTAL IMPLEMENTED $52,763 $155,950 $58,910
1,584,874
kWh
$13,566
-
kW-mo/yr
$(-13,750.0)
-
MMBtu
$4,037
-
Tgal
$(-10,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs