| Assessment Year | 2002 |
|---|---|
| Principal Product | Wooden Furniture |
| NAICS |
n/a
|
| SIC | 2511: Wood Household Furniture, Except Upholstered |
| Sales Range | $50 M to 100M |
| # of Employees | 405 |
| Plant Area |
483,000
ft2
|
| Annual Production | 1,300,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $311,539 | 8,380,800 |
kWh
|
$0.037 |
| Electricity Demand | $143,188 | 24,384 |
kW-mo/yr
|
$5.87 |
| Electricity Fees | $1,462 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,763 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $43,964 | $148,000 |
$55,669
1,497,690
kWh
|
$12,045
-
kW-mo/yr
|
$(-13,750.0)
-
MMBtu
|
- | $(-10,000.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,296 | $45,826 | n/a |
$11,296
302,840
kWh
|
- | - | - | - |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $4,037 | $6,600 | - | - | - |
$4,037
-
Tgal
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,984 | $450 |
$2,620
70,484
kWh
|
$1,364
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $778 | $900 |
$621
16,700
kWh
|
$157
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $64,059 | $201,776 |
$70,206
1,887,714
kWh
|
$13,566
-
kW-mo/yr
|
$(-13,750.0)
-
MMBtu
|
$4,037
-
Tgal
|
$(-10,000.0) | ||
| TOTAL IMPLEMENTED | $52,763 | $155,950 |
$58,910
1,584,874
kWh
|
$13,566
-
kW-mo/yr
|
$(-13,750.0)
-
MMBtu
|
$4,037
-
Tgal
|
$(-10,000.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs