ITAC Assessment: UM0207
ITAC logo
ITAC Assessment: UM0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Inorganic resins and catalysts
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,181 12,163,793
kWh
Electricity Demand $216,421 22,824
kW-mo/yr
Electricity Fees $16,089 -
Natural Gas $520,996 89,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4111: Use closed cycle process to minimize waste water production $119,000 $180,000 - - - $119,000
-
Tgal
02 2.7243: Improve air circulation with destratification fans / other methods $2,811 $3,150 - - $2,811
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,268 $5,045 $1,639
46,452
kWh
$629
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,977 $1,000 $1,427
40,483
kWh
$550
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,710 $450 $1,236
35,015
kWh
$474
-
kW-mo/yr
- -
06 2.2122: Install / repair insulation on condensate lines $560 $634 - - $560
-
MMBtu
-
TOTAL RECOMMENDED $128,326 $190,279 $4,302
121,950
kWh
$1,653
-
kW-mo/yr
$3,371
-
MMBtu
$119,000
-
Tgal
TOTAL IMPLEMENTED $1,710 $450 $1,236
35,015
kWh
$474
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs