Assessment Year | 2002 |
---|---|
Principal Product | forestry blades and saws |
NAICS |
n/a
|
SIC | 3490: |
Sales Range | $10 M to 50M |
# of Employees | 69 |
Plant Area |
92,000
ft2
|
Annual Production | 3,120,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,645 | 5,696,535 |
kWh
|
$0.036 |
Electricity Demand | $145,988 | 1,280 |
kW-mo/yr
|
$114.05 |
Electricity Fees | $4,974 | - |
|
- |
Natural Gas | $23,231 | 4,768 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,594 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4111: Use closed cycle process to minimize waste water production | $18,000 | $5,940 | - | - |
$18,000
-
Tgal
|
- | |
02 | 2.3191: Use demand controller or load shedder | $11,300 | $15,000 | - |
$11,300
-
kW-mo/yr
|
- | - | |
03 | 2.5123: Reduce fluid flow rates | $4,604 | $1,600 |
$3,240
90,000
kWh
|
$1,364
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,937 | $11,015 |
$1,965
54,445
kWh
|
$972
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,362 | $300 |
$2,105
65,575
kWh
|
$1,257
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $932 | $1,000 |
$346
10,776
kWh
|
$209
-
kW-mo/yr
|
- | $377 | |
TOTAL RECOMMENDED | $41,135 | $34,855 |
$7,656
220,796
kWh
|
$15,102
-
kW-mo/yr
|
$18,000
-
Tgal
|
$377 | ||
TOTAL IMPLEMENTED | $33,594 | $22,240 |
$2,451
76,351
kWh
|
$12,766
-
kW-mo/yr
|
$18,000
-
Tgal
|
$377 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs