ITAC Assessment: UM0204
ITAC logo
ITAC Assessment: UM0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product counter balances for furniture
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 29
Plant Area 142,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,356 1,308,047
kWh
Electricity Demand $31,775 332
kW-mo/yr
Electricity Fees $4,894 -
Natural Gas $21,581 4,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $22,500 $27,500 - - - $22,500
02 2.3212: Optimize plant power factor $2,700 $4,970 - - $2,700 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,220 $1,220 $800
22,100
kWh
$420
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,160 $500 $1,160
32,000
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $960 $1,000 $601
18,713
kWh
$359
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $375 $206
6,421
kWh
$124
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,870 $35,565 $2,767
79,234
kWh
$903
-
kW-mo/yr
$2,700 $22,500
TOTAL IMPLEMENTED $5,410 $7,065 $2,166
60,521
kWh
$544
-
kW-mo/yr
$2,700 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs