Assessment Year | 2002 |
---|---|
Principal Product | counter balances for furniture |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 29 |
Plant Area |
142,000
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,356 | 1,308,047 |
kWh
|
$0.036 |
Electricity Demand | $31,775 | 332 |
kW-mo/yr
|
$95.71 |
Electricity Fees | $4,894 | - |
|
- |
Natural Gas | $21,581 | 4,331 |
MMBtu
|
$4.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,870 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,410 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $22,500 | $27,500 | - | - | - | $22,500 | |
02 | 2.3212: Optimize plant power factor | $2,700 | $4,970 | - | - | $2,700 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,220 | $1,220 |
$800
22,100
kWh
|
$420
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,160 | $500 |
$1,160
32,000
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $960 | $1,000 |
$601
18,713
kWh
|
$359
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $375 |
$206
6,421
kWh
|
$124
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $28,870 | $35,565 |
$2,767
79,234
kWh
|
$903
-
kW-mo/yr
|
$2,700 | $22,500 | ||
TOTAL IMPLEMENTED | $5,410 | $7,065 |
$2,166
60,521
kWh
|
$544
-
kW-mo/yr
|
$2,700 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs