ITAC Assessment: UM0200
ITAC logo
ITAC Assessment: UM0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Rolled Aluminum Sheet
NAICS
n/a
SIC 3350:
Sales Range n/a
# of Employees 145
Plant Area 231,400
ft2
Annual Production 175,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,070,370 68,424,000
kWh
Electricity Demand $1,272,598 11,128
kW-mo/yr
Electricity Fees $123,515 -
Natural Gas $2,936,269 666,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $613,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.2414: Use waste heat from hot flue gases to preheat $496,000 $1,557,500 - - $496,000
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $2,300 $5,000 - - $2,300
-
MMBtu
-
03 3.3122: Use filtration, centrifuging to remove contaminants $88,500 $38,500 - - - $88,500
-
gal
04 2.2437: Recover waste heat from equipment $18,500 $16,000 - - $18,500
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $6,418 $2,000 $3,492
223,848
kWh
$2,926
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,869 $750 $1,016
65,144
kWh
$853
-
kW-mo/yr
- -
TOTAL RECOMMENDED $613,587 $1,619,750 $4,508
288,992
kWh
$3,779
-
kW-mo/yr
$516,800
-
MMBtu
$88,500
-
gal
TOTAL IMPLEMENTED $8,287 $2,750 $4,508
288,992
kWh
$3,779
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs