ITAC Assessment: UM0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Engineered Coatings
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 50,000
ft2
Annual Production 475
Tgal
Production Hrs. Annual 2,210
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,995 299,912
kWh
Electricity Demand $26,559 1,908
kW-mo/yr
Electricity Fees $1,750 -
Natural Gas $26,333 3,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,363 $1,083 $654
110,461
kWh
$709
-
kW-mo/yr
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,080 $500 $1,080
17,873
kWh
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $12,400 $2,800 - - $12,400
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $263 $1,020 - - $263
-
MMBtu
-
05 4.631: Install an uninteruptable power supply $3,333 $1,500 - - - $3,333
TOTAL RECOMMENDED $18,439 $6,903 $1,734
128,334
kWh
$709
-
kW-mo/yr
$12,663
-
MMBtu
$3,333
TOTAL IMPLEMENTED $3,333 $1,500 - - - $3,333
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs