| Assessment Year | 2001 |
|---|---|
| Principal Product | Engineered Coatings |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $5 M to 10M |
| # of Employees | 43 |
| Plant Area |
50,000
ft2
|
| Annual Production | 475
Tgal
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $17,995 | 299,912 |
kWh
|
$0.060 |
| Electricity Demand | $26,559 | 1,908 |
kW-mo/yr
|
$13.92 |
| Electricity Fees | $1,750 | - |
|
- |
| Natural Gas | $26,333 | 3,481 |
MMBtu
|
$7.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,333 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,363 | $1,083 |
$654
110,461
kWh
|
$709
-
kW-mo/yr
|
- | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,080 | $500 |
$1,080
17,873
kWh
|
- | - | - | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $12,400 | $2,800 | - | - |
$12,400
-
MMBtu
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $263 | $1,020 | - | - |
$263
-
MMBtu
|
- | |
| 05 | 4.631: Install an uninteruptable power supply | $3,333 | $1,500 | - | - | - | $3,333 | |
| TOTAL RECOMMENDED | $18,439 | $6,903 |
$1,734
128,334
kWh
|
$709
-
kW-mo/yr
|
$12,663
-
MMBtu
|
$3,333 | ||
| TOTAL IMPLEMENTED | $3,333 | $1,500 | - | - | - | $3,333 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs