ITAC Assessment: UM0169
ITAC logo
ITAC Assessment: UM0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Grey Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 200,000
ft2
Annual Production 42,500
ton
Production Hrs. Annual 4,250
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,029 9,669,402
kWh
Electricity Demand $367,944 43,200
kW-mo/yr
Natural Gas $212,095 62,841
MMBtu
Other Energy $990,592 140,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $437,027 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 4.811: Demolish old building to reduce tax and insurance bills $15,444 $2,250 $58
1,758
kWh
$409
-
kW-mo/yr
$5,327
-
MMBtu
$9,650 -
02 2.7135: Install occupancy sensors $1,322 $800 $1,322
43,962
kWh
- - - -
03 2.4131: Size electric motors for peak operating efficiency $27,956 $8,250 $27,956
929,074
kWh
- - - -
04 2.2511: Insulate bare equipment $13,069 $23,100 $9,640
293,083
kWh
$3,429
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $2,117 $500 - - $2,117
-
MMBtu
- -
06 2.7231: Use radiant heater for spot heating $8,102 $10,000 - - $8,102
-
MMBtu
- -
07 2.7243: Improve air circulation with destratification fans / other methods $6,084 $350 - - $6,084
-
MMBtu
- -
08 2.6231: Utilize controls to operate equipment only when needed $50,433 $23,500 - - $50,433
-
MMBtu
- -
09 4.111: Add equipment/ operators to reduce production bottleneck $312,500 $860,000 - - - - $312,500
TOTAL RECOMMENDED $437,027 $928,750 $38,976
1,267,877
kWh
$3,838
-
kW-mo/yr
$72,063
-
MMBtu
$9,650 $312,500
TOTAL IMPLEMENTED $77,418 $37,050 $1,380
45,720
kWh
$409
-
kW-mo/yr
$65,979
-
MMBtu
$9,650 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs