ITAC Assessment: UM0168
ITAC logo
ITAC Assessment: UM0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 250,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,969 18,194,608
kWh
Electricity Demand $376,105 39,876
kW-mo/yr
Electricity Fees $6,298 -
Natural Gas $385,431 116,226
MMBtu
Other Energy $1,852,875 262,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $345,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $526 $993 $254
7,034
kWh
$272
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,117 $50,000 $15,117
433,470
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,945 $2,250 $17,076
532,532
kWh
$7,869
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $8,180 $300 $7,380
139,508
kWh
$800
-
kW-mo/yr
- -
05 2.7243: Improve air circulation with destratification fans / other methods $3,403 $1,400 - - $3,403
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $293,452 $1,020,000 - - $56,129
-
MMBtu
$237,323
-
Tgal
TOTAL RECOMMENDED $345,623 $1,074,943 $39,827
1,112,544
kWh
$8,941
-
kW-mo/yr
$59,532
-
MMBtu
$237,323
-
Tgal
TOTAL IMPLEMENTED $33,651 $3,543 $24,710
679,074
kWh
$8,941
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs