| Assessment Year | 1994 |
|---|---|
| Principal Product | Carpet Yarn |
| NAICS |
n/a
|
| SIC | 2281: Yarn Spinning Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 386 |
| Plant Area |
275,000
ft2
|
| Annual Production | 35,500,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,494,429 | 30,700,762 |
kWh
|
$0.049 |
| Natural Gas | $383,347 | 102,357 |
MMBtu
|
$3.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $104,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,360 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,460 | $34,270 |
$16,460
338,218
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $17,780 | $9,250 |
$17,780
360,785
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,040 | $1,350 | - |
$9,040
-
MMBtu
|
|
| 04 | 2.2522: Isolate hot or cold equipment | $430 | $800 |
$430
8,792
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,600 | $74,700 |
$13,600
543,962
kWh
|
- | |
| 06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $22,900 | $4,000 |
$22,900
916,471
kWh
|
- | |
| 07 | 2.1212: Operate boilers on high fire setting | $12,370 | - | - |
$12,370
-
MMBtu
|
|
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $11,950 | $26,000 | - |
$11,950
-
MMBtu
|
|
| TOTAL RECOMMENDED | $104,530 | $150,370 |
$71,170
2,168,228
kWh
|
$33,360
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $39,360 | $38,270 |
$39,360
1,254,689
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs