ITAC Assessment: GT0529
ITAC logo
ITAC Assessment: GT0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Carpet Yarn
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 386
Plant Area 275,000
ft2
Annual Production 35,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,494,429 30,700,762
kWh
Natural Gas $383,347 102,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,460 $34,270 $16,460
338,218
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,780 $9,250 $17,780
360,785
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $9,040 $1,350 - $9,040
-
MMBtu
04 2.2522: Isolate hot or cold equipment $430 $800 $430
8,792
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,600 $74,700 $13,600
543,962
kWh
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $22,900 $4,000 $22,900
916,471
kWh
-
07 2.1212: Operate boilers on high fire setting $12,370 - - $12,370
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $11,950 $26,000 - $11,950
-
MMBtu
TOTAL RECOMMENDED $104,530 $150,370 $71,170
2,168,228
kWh
$33,360
-
MMBtu
TOTAL IMPLEMENTED $39,360 $38,270 $39,360
1,254,689
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs