ITAC Assessment: UM0166
ITAC logo
ITAC Assessment: UM0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fabricated Sheet Metal
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 45,522
ft2
Annual Production 13,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,812 1,841,735
kWh
Electricity Demand $39,335 4,332
kW-mo/yr
Electricity Fees $(-584.0) -
Natural Gas $16,268 3,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $244 $400 $244
8,206
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $1,683 $1,700 $1,683
45,135
kWh
-
03 2.7231: Use radiant heater for spot heating $2,815 $10,000 - $2,815
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $1,595 $11,900 - $1,595
-
MMBtu
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $562 $3,120 - $562
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $5,705 $5,925 - $5,705
-
MMBtu
TOTAL RECOMMENDED $12,604 $33,045 $1,927
53,341
kWh
$10,677
-
MMBtu
TOTAL IMPLEMENTED $5,705 $5,925 - $5,705
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs