Assessment Year | 2000 |
---|---|
Principal Product | Specialty Chemicals |
NAICS |
n/a
|
SIC | 2800: |
Sales Range | $50 M to 100M |
# of Employees | 146 |
Plant Area |
90,000
ft2
|
Annual Production | 12,200,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,083 | 3,385,405 |
kWh
|
$0.034 |
Electricity Demand | $74,590 | 8,256 |
kW-mo/yr
|
$9.03 |
Electricity Fees | $11,159 | - |
|
- |
Natural Gas | $57,892 | 15,586 |
MMBtu
|
$3.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,724 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,973 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $575 | $500 |
$377
11,137
kWh
|
$198
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,279 | $300 |
$1,492
44,256
kWh
|
$787
-
kW-mo/yr
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $664 | $309 | - | - |
$664
-
MMBtu
|
- | |
04 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $5,751 | $18,000 | - | - |
$5,751
-
MMBtu
|
- | |
05 | 3.4115: Recover and reuse cooling water | $31,455 | $21,257 | - | - | - |
$31,455
-
Tgal
|
|
TOTAL RECOMMENDED | $40,724 | $40,366 |
$1,869
55,393
kWh
|
$985
-
kW-mo/yr
|
$6,415
-
MMBtu
|
$31,455
-
Tgal
|
||
TOTAL IMPLEMENTED | $34,973 | $22,366 |
$1,869
55,393
kWh
|
$985
-
kW-mo/yr
|
$664
-
MMBtu
|
$31,455
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs