ITAC Assessment: UM0155
ITAC logo
ITAC Assessment: UM0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Specialty Chemicals
NAICS
n/a
SIC 2800:
Sales Range $50
M
to 100
M
# of Employees 146
Plant Area 90,000
ft2
Annual Production 12,200,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,083 3,385,405
kWh
Electricity Demand $74,590 8,256
kW-mo/yr
Electricity Fees $11,159 -
Natural Gas $57,892 15,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4221: Install compressor air intakes in coolest locations $575 $500 $377
11,137
kWh
$198
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,279 $300 $1,492
44,256
kWh
$787
-
kW-mo/yr
- -
03 2.2136: Install / repair insulation on steam lines $664 $309 - - $664
-
MMBtu
-
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $5,751 $18,000 - - $5,751
-
MMBtu
-
05 3.4115: Recover and reuse cooling water $31,455 $21,257 - - - $31,455
-
Tgal
TOTAL RECOMMENDED $40,724 $40,366 $1,869
55,393
kWh
$985
-
kW-mo/yr
$6,415
-
MMBtu
$31,455
-
Tgal
TOTAL IMPLEMENTED $34,973 $22,366 $1,869
55,393
kWh
$985
-
kW-mo/yr
$664
-
MMBtu
$31,455
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs