ITAC Assessment: UM0154
ITAC logo
ITAC Assessment: UM0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printed Labels
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,015 1,201,055
kWh
Electricity Fees $200 -
Natural Gas $12,669 3,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,018,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7122: Disconnect ballasts $2,608 $880 $2,608
26,084
kWh
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $732 $1,400 $732
7,327
kWh
- - - - -
03 2.2437: Recover waste heat from equipment $7,312 $25,370 - - - $7,312 - -
04 2.7314: Reduce ventilation air $18,794 - $408
4,103
kWh
$1,230
-
MMBtu
- - $17,156 -
05 3.5313: Increase amount of waste recovered for resale $9,360 - - - $9,360
-
lb
- - -
06 4.451: Add additional production shift $1,980,000 $568,714 - - - - - $1,980,000
TOTAL RECOMMENDED $2,018,806 $596,364 $3,748
37,514
kWh
$1,230
-
MMBtu
$9,360
-
lb
$7,312 $17,156 $1,980,000
TOTAL IMPLEMENTED $30,762 $880 $3,016
30,187
kWh
$1,230
-
MMBtu
$9,360
-
lb
- $17,156 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs