ITAC Assessment: MA0544
ITAC logo
ITAC Assessment: MA0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product metal finishing
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,712 363,600
kWh
Natural Gas $81,957 7,815
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2491: Use cooling air which cools hot work pieces for space heating $3,663 $2,000 $(-182.0)
(-1,817)
kWh
$3,845
-
MMBtu
02 2.6218: Turn off equipment when not in use $2,425 $2,000 $2,425
24,250
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,646 $6,156 $1,646
16,546
kWh
-
04 2.7135: Install occupancy sensors $1,236 $600 $1,236
12,360
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $543 $20 $543
5,342
kWh
-
TOTAL RECOMMENDED $9,513 $10,776 $5,668
56,681
kWh
$3,845
-
MMBtu
TOTAL IMPLEMENTED $5,852 $8,176 $2,007
20,071
kWh
$3,845
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs