ITAC Assessment: UM0142
ITAC logo
ITAC Assessment: UM0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aluminum and Zinc Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 90,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,076 4,897,714
kWh
Electricity Demand $148,365 12,276
kW-mo/yr
Electricity Fees $17,701 -
Natural Gas $320,346 92,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $269,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings Increase in Production Savings
01 2.4221: Install compressor air intakes in coolest locations $416 $450 $416
24,619
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,691 $1,250 $1,631
114,009
kWh
$3,060
-
kW-mo/yr
- - - -
03 2.6218: Turn off equipment when not in use $39 - $39
2,345
kWh
- - - - -
04 2.1122: Re-size charging openings or add a movable door on equipment $55,979 $38,958 - - - $55,979
-
MMBtu
- -
05 2.2414: Use waste heat from hot flue gases to preheat $44,187 $52,200 - - - $44,187
-
MMBtu
- -
06 2.3212: Optimize plant power factor $7,489 $10,860 - - $7,489 - - -
07 3.4155: Meter waste water $6,412 $500 - - - - $6,412
-
Tgal
-
08 4.111: Add equipment/ operators to reduce production bottleneck $150,000 $150,000 - - - - - $150,000
TOTAL RECOMMENDED $269,213 $254,218 $2,086
140,973
kWh
$3,060
-
kW-mo/yr
$7,489 $100,166
-
MMBtu
$6,412
-
Tgal
$150,000
TOTAL IMPLEMENTED $19,047 $13,060 $2,086
140,973
kWh
$3,060
-
kW-mo/yr
$7,489 - $6,412
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs