ITAC Assessment: DS0121
ITAC logo
ITAC Assessment: DS0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Precision Granite Bases
NAICS
n/a
SIC 3298:
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 68,990
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 4,940
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,696 1,064,771
kWh
Electricity Demand $21,378 2,782
kW-mo/yr
Electricity Fees $185 -
Natural Gas $8,492 1,833
MMBtu
LPG $3,273 280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.7261: Install timers and/or thermostats $1,311 $1,155 - - $1,311
-
MMBtu
- - - -
02 2.4221: Install compressor air intakes in coolest locations $240 $250 $152
4,396
kWh
$88
-
kW-mo/yr
- - - - -
03 2.7124: Make a practice of turning off lights when not needed $679 $50 $679
19,930
kWh
- - - - - -
04 4.211: Consider use / purchase of bulk materials where possible $1,620 $1,350 - - - - - $1,620 -
05 3.4154: Eliminate leaks in water lines and valves $962 $74 - - - - - - $962
-
Tgal
06 3.7135: Minimize use of rags through worker training $11,700 $700 - - - - - $11,700 -
07 3.1191: Change procedures / equipment / operating conditions $700 $6 - - - - $700 - -
08 3.1191: Change procedures / equipment / operating conditions $16,640 - - - - $16,640 - - -
TOTAL RECOMMENDED $33,852 $3,585 $831
24,326
kWh
$88
-
kW-mo/yr
$1,311
-
MMBtu
$16,640 $700 $13,320 $962
-
Tgal
TOTAL IMPLEMENTED $19,221 $380 $831
24,326
kWh
$88
-
kW-mo/yr
- $16,640 $700 - $962
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs