ITAC Assessment: UM0133
ITAC logo
ITAC Assessment: UM0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plating and Painting
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 150,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $439,856 8,311,255
kWh
Electricity Demand $11,034 600
kW-mo/yr
Electricity Fees $3,574 -
Natural Gas $44,873 19,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $686,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $353,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $2,000 $2,000 $1,312
23,447
kWh
$688
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $35,000 $43,000 - - - $35,000
03 3.4151: Minimize water usage $35,600 $5,500 - - $35,600
-
Tgal
-
04 3.4114: Replace city water with recycled water via cooling tower $21,232 $14,700 - - $21,232
-
Tgal
-
05 3.4111: Use closed cycle process to minimize waste water production $259,748 $13,300 - - $259,748
-
Tgal
-
06 3.3132: Use reverse osmosis to concentrate material $307,747 $800,000 n/a - - $307,747
-
Tgal
-
07 4.611: Begin a practice of predictive / preventative maintenance $25,360 $15,700 - - - $25,360
TOTAL RECOMMENDED $686,687 $894,200 $1,312
23,447
kWh
$688
-
kW-mo/yr
$624,327
-
Tgal
$60,360
TOTAL IMPLEMENTED $353,580 $78,500 $1,312
23,447
kWh
$688
-
kW-mo/yr
$316,580
-
Tgal
$35,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs