ITAC Assessment: AR0074
ITAC logo
ITAC Assessment: AR0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Truck Transmissions
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 325
Plant Area 220,000
ft2
Annual Production 47,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $671,834 20,245,897
kWh
Natural Gas $49,600 14,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $800 $584 $800
20,516
kWh
- -
02 2.4133: Use most efficient type of electric motors $10,013 $14,650 $10,013
325,029
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,864 $350 $9,864
320,340
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,547 $25 $1,547
50,410
kWh
- -
05 2.3212: Optimize plant power factor $5,669 $13,220 $5,669
-
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $139,091 $55,000 $188,617
2,878,371
kWh
$(-49,526.0)
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $408 - $408
13,189
kWh
- -
08 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $18,582 $500 $18,582
743,552
kWh
- -
09 2.6218: Turn off equipment when not in use $2,696 $200 $2,696
107,855
kWh
- -
10 3.7311: Maintain machines to reduce leaks $3,240 $1,000 - - $3,240
-
Tgal
TOTAL RECOMMENDED $191,910 $85,529 $238,196
4,459,262
kWh
$(-49,526.0)
-
MMBtu
$3,240
-
Tgal
TOTAL IMPLEMENTED $47,150 $17,309 $43,910
1,580,891
kWh
- $3,240
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs