ITAC Assessment: UM0122
ITAC logo
ITAC Assessment: UM0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hobbies, Crafts and Toys
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 103,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,033 3,667,937
kWh
Electricity Demand $79,259 8,196
kW-mo/yr
Electricity Fees $6,478 -
Natural Gas $37,563 7,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $10,711 $6,800 $8,683
148,300
kWh
$2,028
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $557 $1,000 $557
9,379
kWh
- - - - -
03 2.2437: Recover waste heat from equipment $950 $1,470 - - $950
-
MMBtu
- - -
04 3.7131: Use a rag recycle service $5,818 - - - - $5,818
-
lb
- -
05 3.4155: Meter waste water $761 $150 - - - - - $761
-
Tgal
06 4.321: Optimize production lot sizes and inventories $29,300 - - - - - $29,300 -
TOTAL RECOMMENDED $48,097 $9,420 $9,240
157,679
kWh
$2,028
-
kW-mo/yr
$950
-
MMBtu
$5,818
-
lb
$29,300 $761
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings