ITAC Assessment: UM0117
ITAC logo
ITAC Assessment: UM0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Shipping Containers Components
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 74,000
ft2
Annual Production 29
ton
Production Hrs. Annual 5,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,555 1,720,985
kWh
Electricity Demand $37,215 4,356
kW-mo/yr
Electricity Fees $11,233 -
Natural Gas $28,903 7,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $558 $918 $259
9,086
kWh
$299
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,896 $9,124 $1,345
45,721
kWh
$2,551
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $724 $1,000 $225
7,620
kWh
$499
-
kW-mo/yr
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,314 $658 - - $3,314
-
MMBtu
- -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,400 $1,000 - - - $14,400
-
gal
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $2,059 $250 - - - - $2,059
-
lb
07 3.5314: Use in-process recycling whenever possible $11,000 $11,000 - - - - $11,000
-
lb
TOTAL RECOMMENDED $35,951 $23,950 $1,829
62,427
kWh
$3,349
-
kW-mo/yr
$3,314
-
MMBtu
$14,400
-
gal
$13,059
-
lb
TOTAL IMPLEMENTED $10,551 $11,950 $1,829
62,427
kWh
$3,349
-
kW-mo/yr
$3,314
-
MMBtu
- $2,059
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs