ITAC Assessment: UM0116
ITAC logo
ITAC Assessment: UM0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Forged Rings
NAICS
n/a
SIC 3717:
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 93,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,086 6,830,598
kWh
Electricity Demand $228,124 15,192
kW-mo/yr
Electricity Fees $(-5,332.0) -
Natural Gas $500,824 143,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $364 $980 $202
6,155
kWh
$162
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $663 $2,419 $486
13,482
kWh
$177
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $364 $1,200 $202
9,379
kWh
$162
-
kW-mo/yr
- - -
04 3.4115: Recover and reuse cooling water $19,654 $4,350 - - - $19,654
-
Tgal
-
05 3.4155: Meter waste water $1,447 $150 - - - - $1,447
06 4.431: Train operators for maximum operating efficiency $28,299 - - - $28,299
-
MMBtu
- -
07 4.431: Train operators for maximum operating efficiency $2,565 - - $2,565
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $53,356 $9,099 $890
29,016
kWh
$3,066
-
kW-mo/yr
$28,299
-
MMBtu
$19,654
-
Tgal
$1,447
TOTAL IMPLEMENTED $24,693 $8,119 $688
22,861
kWh
$2,904
-
kW-mo/yr
- $19,654
-
Tgal
$1,447
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs