Assessment Year | 1998 |
---|---|
Principal Product | Forged Rings |
NAICS |
n/a
|
SIC | 3717: |
Sales Range | $10 M to 50M |
# of Employees | 41 |
Plant Area |
93,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,086 | 6,830,598 |
kWh
|
$0.016 |
Electricity Demand | $228,124 | 15,192 |
kW-mo/yr
|
$15.02 |
Electricity Fees | $(-5,332.0) | - |
|
- |
Natural Gas | $500,824 | 143,816 |
MMBtu
|
$3.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,356 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,693 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $364 | $980 |
$202
6,155
kWh
|
$162
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $663 | $2,419 |
$486
13,482
kWh
|
$177
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $364 | $1,200 |
$202
9,379
kWh
|
$162
-
kW-mo/yr
|
- | - | - | |
04 | 3.4115: Recover and reuse cooling water | $19,654 | $4,350 | - | - | - |
$19,654
-
Tgal
|
- | |
05 | 3.4155: Meter waste water | $1,447 | $150 | - | - | - | - | $1,447 | |
06 | 4.431: Train operators for maximum operating efficiency | $28,299 | - | - | - |
$28,299
-
MMBtu
|
- | - | |
07 | 4.431: Train operators for maximum operating efficiency | $2,565 | - | - |
$2,565
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $53,356 | $9,099 |
$890
29,016
kWh
|
$3,066
-
kW-mo/yr
|
$28,299
-
MMBtu
|
$19,654
-
Tgal
|
$1,447 | ||
TOTAL IMPLEMENTED | $24,693 | $8,119 |
$688
22,861
kWh
|
$2,904
-
kW-mo/yr
|
- |
$19,654
-
Tgal
|
$1,447 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs