ITAC Assessment: UM0115
ITAC logo
ITAC Assessment: UM0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Super-abrasive Tipped Cutting Tools parts
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 48,500
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 5,863
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,753 1,407,679
kWh
Electricity Demand $59,964 4,032
kW-mo/yr
Electricity Fees $2,766 -
Natural Gas $5,945 1,491
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $204 $303 $104
3,517
kWh
$100
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,764 $6,186 $1,054
34,584
kWh
$1,710
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $888 $804 - - $888 - - -
04 2.4221: Install compressor air intakes in coolest locations $410 $600 $223
7,034
kWh
$187
-
kW-mo/yr
- - - -
05 3.5311: Recover and reuse waste material $1,040 $500 - - - $1,040
-
lb
- -
06 3.1191: Change procedures / equipment / operating conditions $510 - - - - - $510
-
lb
-
07 4.122: Develop standard procedures to improve internal yields $7,650 $1,500 - - - - - $7,650
TOTAL RECOMMENDED $13,466 $9,893 $1,381
45,135
kWh
$1,997
-
kW-mo/yr
$888 $1,040
-
lb
$510
-
lb
$7,650
TOTAL IMPLEMENTED $10,292 $3,107 $104
3,517
kWh
$100
-
kW-mo/yr
$888 $1,040
-
lb
$510
-
lb
$7,650
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs