Assessment Year | 1998 |
---|---|
Principal Product | Super-abrasive Tipped Cutting Tools parts |
NAICS |
n/a
|
SIC | 3465: Automotive Stampings |
Sales Range | $5 M to 10M |
# of Employees | 56 |
Plant Area |
48,500
ft2
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 5,863
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,753 | 1,407,679 |
kWh
|
$0.028 |
Electricity Demand | $59,964 | 4,032 |
kW-mo/yr
|
$14.87 |
Electricity Fees | $2,766 | - |
|
- |
Natural Gas | $5,945 | 1,491 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,466 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,292 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $204 | $303 |
$104
3,517
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,764 | $6,186 |
$1,054
34,584
kWh
|
$1,710
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.3212: Optimize plant power factor | $888 | $804 | - | - | $888 | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $410 | $600 |
$223
7,034
kWh
|
$187
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.5311: Recover and reuse waste material | $1,040 | $500 | - | - | - |
$1,040
-
lb
|
- | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $510 | - | - | - | - | - |
$510
-
lb
|
- | |
07 | 4.122: Develop standard procedures to improve internal yields | $7,650 | $1,500 | - | - | - | - | - | $7,650 | |
TOTAL RECOMMENDED | $13,466 | $9,893 |
$1,381
45,135
kWh
|
$1,997
-
kW-mo/yr
|
$888 |
$1,040
-
lb
|
$510
-
lb
|
$7,650 | ||
TOTAL IMPLEMENTED | $10,292 | $3,107 |
$104
3,517
kWh
|
$100
-
kW-mo/yr
|
$888 |
$1,040
-
lb
|
$510
-
lb
|
$7,650 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs