ITAC Assessment: UM0113
ITAC logo
ITAC Assessment: UM0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Food Procesing Equipment
NAICS
n/a
SIC 3550:
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 45,935
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,143 2,533,705
kWh
Electricity Demand $99,616 5,472
kW-mo/yr
Electricity Fees $3,329 -
Natural Gas $18,229 2,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $3,418 $2,142 $2,356
32,825
kWh
$1,062
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,663 $25,773 $11,709
161,782
kWh
$8,954
-
kW-mo/yr
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $436 $650 - - $436
-
MMBtu
- -
04 2.7243: Improve air circulation with destratification fans / other methods $3,162 $960 - - $3,162
-
MMBtu
- -
05 3.3131: Use evaporation to concentrate material $7,020 $16,000 - - - $7,020
-
Tgal
-
06 3.3122: Use filtration, centrifuging to remove contaminants $3,814 $11,000 - - - $3,814
-
Tgal
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $15,000 $1,554 - - - - $15,000
08 4.515: Install shelves / racks to utilize unused space $3,480 $3,342 - - - - $3,480
TOTAL RECOMMENDED $56,993 $61,421 $14,065
194,607
kWh
$10,016
-
kW-mo/yr
$3,598
-
MMBtu
$10,834
-
Tgal
$18,480
TOTAL IMPLEMENTED $45,723 $33,771 $14,065
194,607
kWh
$10,016
-
kW-mo/yr
$3,162
-
MMBtu
- $18,480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs