ITAC Assessment: OK0236
ITAC logo
ITAC Assessment: OK0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SWITCHES & GAUGES
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 180,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,877 691,970
kWh
Natural Gas $10,071 2,024
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $759 $238 $822
13,189
kWh
$(-63.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $353 $734 $382
5,862
kWh
$(-29.0)
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $241 $80 $241
5,862
kWh
- -
04 2.7261: Install timers and/or thermostats $2,644 $3,300 - $2,644
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $283 - $343
11,137
kWh
- $(-60.0)
06 2.8112: Combine utility meters $768 $520 - $768
-
MMBtu
-
07 2.3191: Use demand controller or load shedder $1,280 $820 $1,280
-
kWh
- -
TOTAL RECOMMENDED $6,328 $5,692 $3,068
36,050
kWh
$3,320
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $6,328 $5,692 $3,068
36,050
kWh
$3,320
-
MMBtu
$(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs