ITAC Assessment: UM0100
ITAC logo
ITAC Assessment: UM0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive Stampings and Assemblies
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 263
Plant Area 124,502
ft2
Annual Production 2,893,000
units
Production Hrs. Annual 6,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,625 4,233,001
kWh
Electricity Demand $165,858 9,444
kW-mo/yr
Electricity Fees $(-664.0) -
Natural Gas $74,676 15,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,265 $28,912 $3,874
131,008
kWh
$3,391
-
kW-mo/yr
-
02 2.7124: Make a practice of turning off lights when not needed $378 - $378
17,292
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $6,676 $2,400 $3,401
114,889
kWh
$3,275
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,306 $16,063 $4,306
334,701
kWh
- -
05 4.513: Re-arrange equipment layout to reduce labor costs $40,519 $38 - - $40,519
TOTAL RECOMMENDED $59,144 $47,413 $11,959
597,890
kWh
$6,666
-
kW-mo/yr
$40,519
TOTAL IMPLEMENTED $13,941 $31,312 $7,275
245,897
kWh
$6,666
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs