ITAC Assessment: UM0098
ITAC logo
ITAC Assessment: UM0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fiberglass reinforced products
NAICS
n/a
SIC 3070:
Sales Range $1
M
to 5
M
# of Employees 41
Plant Area 38,000
ft2
Annual Production 350
ton
Production Hrs. Annual 2,470
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,728 518,171
kWh
Electricity Demand $27,619 2,388
kW-mo/yr
Electricity Fees $606 -
Natural Gas $19,064 4,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $364 $5,910 $152
3,517
kWh
$212
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,225 $10,986 $1,327
30,188
kWh
$1,898
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $939 $480 $566
5,862
kWh
$373
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,222 $700 $2,222
23,447
kWh
- -
05 4.121: Maintain clean conditions before painting $23,453 $15,000 - - $23,453
TOTAL RECOMMENDED $30,203 $33,076 $4,267
63,014
kWh
$2,483
-
kW-mo/yr
$23,453
TOTAL IMPLEMENTED $3,525 $7,090 $2,940
32,826
kWh
$585
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs