ITAC Assessment: UM0096
ITAC logo
ITAC Assessment: UM0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product High Pressure Water Jetting Systems
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 40,200
ft2
Annual Production 216,000
units
Production Hrs. Annual 6,552
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,663 1,464,830
kWh
Electricity Fees $3,146 -
Natural Gas $28,869 7,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $1,791 $2,165 $1,791
17,878
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,478 $9,846 $5,478
54,807
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,896 $1,000 $1,896
19,050
kWh
- -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $30,459 $1,000 - $30,459
-
gal
-
05 4.423: Move product using mechanical means $640 $4,500 - - $640
TOTAL RECOMMENDED $40,264 $18,511 $9,165
91,735
kWh
$30,459
-
gal
$640
TOTAL IMPLEMENTED $34,786 $8,665 $3,687
36,928
kWh
$30,459
-
gal
$640
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs