ITAC Assessment: UM0094
ITAC logo
ITAC Assessment: UM0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Agricultural Tillage Tools
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area 113,862
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 3,854
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,745 4,040,152
kWh
Electricity Demand $86,517 22,140
kW-mo/yr
Electricity Fees $9,039 -
Natural Gas $155,295 38,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $706 $1,185 $377
8,499
kWh
$329
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,560 $22,835 $1,336
30,481
kWh
$1,224
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,236 $1,000 $667
5,275
kWh
$569
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $5,407 $2,520 $2,527
76,788
kWh
$2,880
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $18,874 $7,590 $18,874
1,248,535
kWh
- - -
06 3.1191: Change procedures / equipment / operating conditions $1,600 - - - $1,600
-
lb
-
07 4.652: Replace existing equipment with more suitable substitutes $37,500 $2,500 - - - $37,500
TOTAL RECOMMENDED $67,883 $37,630 $23,781
1,369,578
kWh
$5,002
-
kW-mo/yr
$1,600
-
lb
$37,500
TOTAL IMPLEMENTED $19,580 $8,775 $19,251
1,257,034
kWh
$329
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs