ITAC Assessment: UM0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Injection Molding Components
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 35,250
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,699 2,041,325
kWh
Electricity Demand $51,404 2,988
kW-mo/yr
Electricity Fees $12,725 -
Natural Gas $8,135 2,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $1,010 $1,307 $509
17,292
kWh
$501
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,671 $12,962 $1,387
46,893
kWh
$1,284
-
kW-mo/yr
- -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,775 $90 $3,775
65,651
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $624 $600 $324
10,844
kWh
$300
-
kW-mo/yr
- -
05 4.441: Install automatic packing equipment $90,870 $30,000 - - $6,000
-
lb
$84,870
TOTAL RECOMMENDED $98,950 $44,959 $5,995
140,680
kWh
$2,085
-
kW-mo/yr
$6,000
-
lb
$84,870
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs