ITAC Assessment: MS0129
ITAC logo
ITAC Assessment: MS0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 44,500
ft2
Annual Production 21,500,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,454 2,073,271
kWh
Electricity Demand $26,274 5,543
kW-mo/yr
Electricity Fees $33,683 -
Natural Gas $4,125 314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,555

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $11,582 - - - $11,582 - - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,133 $479 $1,957
74,443
kWh
- $1,176 - - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,721 $29,711 $6,255
237,397
kWh
$1,645
-
kW-mo/yr
$3,821 - - - - - -
04 2.7241: Install outside air damper / economizer on hvac unit $1,500 $3,600 $937
35,463
kWh
- $563 - - - - - -
05 3.6124: Burn waste oil for heat $623 $1,804 - - - $443
-
MMBtu
- $180
-
gal
- - -
06 3.4154: Eliminate leaks in water lines and valves $3,555 $250 - - - - $392
-
Tgal
- - $497
-
Tgal
$2,666
07 4.515: Install shelves / racks to utilize unused space $6,831 $7,225 - - - - - - $6,831 - -
TOTAL RECOMMENDED $38,945 $43,069 $9,149
347,303
kWh
$1,645
-
kW-mo/yr
$17,142 $443
-
MMBtu
$392
-
Tgal
$180
-
gal
$6,831 $497
-
Tgal
$2,666
TOTAL IMPLEMENTED $3,555 $250 - - - - $392
-
Tgal
- - $497
-
Tgal
$2,666
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs