ITAC Assessment: LT0102
ITAC logo
ITAC Assessment: LT0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRE-ENGINEERED METAL BUILDINGS
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,007 2,211,020
kWh
Natural Gas $55,048 13,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,054

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,710 $6,680 $6,710
-
kWh
-
02 2.7261: Install timers and/or thermostats $3,748 $1,030 $3,070
65,064
kWh
$678
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,116 $671 $1,116
19,050
kWh
-
04 2.4133: Use most efficient type of electric motors $480 $757 $480
8,499
kWh
-
TOTAL RECOMMENDED $12,054 $9,138 $11,376
92,613
kWh
$678
-
MMBtu
TOTAL IMPLEMENTED $12,054 $9,138 $11,376
92,613
kWh
$678
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs