| Assessment Year | 1997 |
|---|---|
| Principal Product | Motor Vehicle Parts & Accessories |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
25,000
ft2
|
| Annual Production | 2,068,800
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,519 | 417,351 |
kWh
|
$0.099 |
| Electricity Fees | $636 | - |
|
- |
| Natural Gas | $9,957 | 2,343 |
MMBtu
|
$4.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,422 | $3,629 |
$1,422
14,361
kWh
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,164 | $450 |
$1,164
11,723
kWh
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $536 | $600 |
$536
5,275
kWh
|
- | - | - | - | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,172 | $2,400 | - |
$3,172
-
MMBtu
|
- | - | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,812 | $4,130 | - |
$2,812
-
MMBtu
|
- | - | - | |
| 06 | 3.5111: Filter and reuse hydraulic oil | $1,095 | $10 | - | - | - | $1,095 | - | |
| 07 | 3.5217: Reuse / recycle/ sell paper products | $2,290 | - | - | - |
$2,290
-
lb
|
- | - | |
| 08 | 4.514: Re-arrange equipment layout to reduce handling costs | $8,000 | $80 | - | - | - | - | $8,000 | |
| TOTAL RECOMMENDED | $20,491 | $11,299 |
$3,122
31,359
kWh
|
$5,984
-
MMBtu
|
$2,290
-
lb
|
$1,095 | $8,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs