ITAC Assessment: UM0071
ITAC logo
ITAC Assessment: UM0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Material Handling Shipping Racks
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 207
Plant Area 78,130
ft2
Annual Production 26,000
pieces
Production Hrs. Annual 6,426
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,973 1,140,387
kWh
Electricity Fees $(-2,329.0) -
Natural Gas $19,058 4,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $209 $422 $209
2,052
kWh
- - -
02 2.8114: Change rate schedules or other changes in utility service $9,820 $250 - $9,820 - -
03 2.4221: Install compressor air intakes in coolest locations $759 $1,000 $759
7,620
kWh
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $5,217 $9,600 - - $5,217
-
MMBtu
-
05 3.5316: Contract a wood pallet recycling company $352 - - - - $352
-
lb
TOTAL RECOMMENDED $16,357 $11,272 $968
9,672
kWh
$9,820 $5,217
-
MMBtu
$352
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs