ITAC Assessment: UM0070
ITAC logo
ITAC Assessment: UM0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Manufacture and Printing Envelopes
NAICS
n/a
SIC 2640:
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 61,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,195 1,453,693
kWh
Electricity Demand $51,857 2,930
kW-mo/yr
Electricity Fees $(-714.0) -
Natural Gas $16,990 3,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $712 $672 $402
13,482
kWh
$310
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,003 $13,133 $5,912
75,615
kWh
$3,091
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $787 $360 $409
13,775
kWh
$378
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $1,665 $3,200 - - $1,665
-
MMBtu
-
05 3.1162: Use less wasteful packaging $18,956 $23,850 - - - $18,956
-
lb
TOTAL RECOMMENDED $31,123 $41,215 $6,723
102,872
kWh
$3,779
-
kW-mo/yr
$1,665
-
MMBtu
$18,956
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs