ITAC Assessment: UM0063
ITAC logo
ITAC Assessment: UM0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Paper products
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 8,472
ft2
Annual Production 55,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,056 730,657
kWh
Natural Gas $44,524 10,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,475 $2,470 $1,475
14,361
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,356 $14,031 $5,356
37,222
kWh
- - -
03 2.7442: Keep doors and windows shut when not on use $18,800 $4,000 - $18,800
-
MMBtu
- -
04 3.4115: Recover and reuse cooling water $2,035 $780 - - $2,035
-
Tgal
-
05 3.1191: Change procedures / equipment / operating conditions $4,531 - - - - $4,531
-
lb
TOTAL RECOMMENDED $32,197 $21,281 $6,831
51,583
kWh
$18,800
-
MMBtu
$2,035
-
Tgal
$4,531
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs