| Assessment Year | 2004 |
|---|---|
| Principal Product | School Buses |
| NAICS | 336211: Motor Vehicle Body Manufacturing |
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $100 M to 500M |
| # of Employees | 375 |
| Plant Area |
295,000
ft2
|
| Annual Production | 4,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $175,838 | 3,786,300 |
kWh
|
$0.046 |
| Electricity Demand | $82,509 | 9,216 |
kW-mo/yr
|
$8.95 |
| Electricity Fees | $12,173 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,405 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $15,414 | $30,000 | n/a | - | - |
$15,414
-
MMBtu
|
- |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,785 | $3,525 |
$1,785
48,670
kWh
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $595 | $765 |
$595
16,248
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,306 | $2,046 |
$1,098
30,000
kWh
|
$1,208
-
kW-mo/yr
|
- | - | |
| 05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,022 | $3,380 |
$352
9,620
kWh
|
$775
-
kW-mo/yr
|
- |
$3,895
-
Tgal
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,490 | $2,500 |
$8,490
232,036
kWh
|
- | - | - | |
| 07 | 2.7261: Install timers and/or thermostats | $729 | $1,500 |
$66
1,817
kWh
|
- |
$663
-
MMBtu
|
- | |
| 08 | 2.2437: Recover waste heat from equipment | $8,773 | $4,900 | - | - |
$8,773
-
MMBtu
|
- | |
| 09 | 2.7111: Reduce illumination to minimum necessary levels | $3,609 | - |
$1,892
46,920
kWh
|
$1,717
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $46,723 | $48,616 |
$14,278
385,311
kWh
|
$3,700
-
kW-mo/yr
|
$24,850
-
MMBtu
|
$3,895
-
Tgal
|
||
| TOTAL IMPLEMENTED | $14,405 | $4,546 |
$11,480
308,956
kWh
|
$2,925
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs