ITAC Assessment: GT0794
ITAC logo
ITAC Assessment: GT0794
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product School Buses
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $100
M
to 500
M
# of Employees 375
Plant Area 295,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,838 3,786,300
kWh
Electricity Demand $82,509 9,216
kW-mo/yr
Electricity Fees $12,173 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,414 $30,000 n/a - - $15,414
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $1,785 $3,525 $1,785
48,670
kWh
- - -
03 2.7135: Install occupancy sensors $595 $765 $595
16,248
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,306 $2,046 $1,098
30,000
kWh
$1,208
-
kW-mo/yr
- -
05 2.2614: Use cooling tower or economizer to replace chiller cooling $5,022 $3,380 $352
9,620
kWh
$775
-
kW-mo/yr
- $3,895
-
Tgal
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,490 $2,500 $8,490
232,036
kWh
- - -
07 2.7261: Install timers and/or thermostats $729 $1,500 $66
1,817
kWh
- $663
-
MMBtu
-
08 2.2437: Recover waste heat from equipment $8,773 $4,900 - - $8,773
-
MMBtu
-
09 2.7111: Reduce illumination to minimum necessary levels $3,609 - $1,892
46,920
kWh
$1,717
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,723 $48,616 $14,278
385,311
kWh
$3,700
-
kW-mo/yr
$24,850
-
MMBtu
$3,895
-
Tgal
TOTAL IMPLEMENTED $14,405 $4,546 $11,480
308,956
kWh
$2,925
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs