Assessment Year | 1996 |
---|---|
Principal Product | Automotive Equipment Painting |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
400,000
ft2
|
Annual Production | 3,850,000
pieces
|
Production Hrs. Annual | 5,184
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,601 | 5,571,219 |
kWh
|
$0.060 |
Electricity Demand | $114,530 | 11,778 |
kW-mo/yr
|
$9.72 |
Electricity Fees | $16,802 | - |
|
- |
Natural Gas | $43,849 | 10,068 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,319 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,624 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $616 | $718 |
$616
6,155
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,893 | $4,042 |
$2,893
28,429
kWh
|
- | - | |
03 | 2.3212: Optimize plant power factor | $10,881 | $250 | - | $10,881 | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,611 | $3,000 |
$1,611
17,292
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $701 | $100 |
$701
7,034
kWh
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $1,533 | $658 |
$1,533
16,413
kWh
|
- | - | |
07 | 3.4113: Treat and reuse rinse waters | $3,084 | - | - | - |
$3,084
-
lb
|
|
TOTAL RECOMMENDED | $21,319 | $8,768 |
$7,354
75,323
kWh
|
$10,881 |
$3,084
-
lb
|
||
TOTAL IMPLEMENTED | $16,624 | $5,768 |
$5,743
58,031
kWh
|
$10,881 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs