ITAC Assessment: UM0062
ITAC logo
ITAC Assessment: UM0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Equipment Painting
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 400,000
ft2
Annual Production 3,850,000
pieces
Production Hrs. Annual 5,184
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,601 5,571,219
kWh
Electricity Demand $114,530 11,778
kW-mo/yr
Electricity Fees $16,802 -
Natural Gas $43,849 10,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $616 $718 $616
6,155
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,893 $4,042 $2,893
28,429
kWh
- -
03 2.3212: Optimize plant power factor $10,881 $250 - $10,881 -
04 2.4221: Install compressor air intakes in coolest locations $1,611 $3,000 $1,611
17,292
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 $100 $701
7,034
kWh
- -
06 2.4314: Use synthetic lubricant $1,533 $658 $1,533
16,413
kWh
- -
07 3.4113: Treat and reuse rinse waters $3,084 - - - $3,084
-
lb
TOTAL RECOMMENDED $21,319 $8,768 $7,354
75,323
kWh
$10,881 $3,084
-
lb
TOTAL IMPLEMENTED $16,624 $5,768 $5,743
58,031
kWh
$10,881 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs