ITAC Assessment: UM0054
ITAC logo
ITAC Assessment: UM0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Paint Thinners and Adhesives and Sealants
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 29,000
ft2
Annual Production 5,000
Tgal
Production Hrs. Annual 2,677
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,682 1,252,931
kWh
Electricity Fees $4,460 -
Natural Gas $60,253 13,129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $7,890 $10,080 $7,890
58,910
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,793 $16,153 $2,793
27,257
kWh
- - -
03 2.4226: Use / purchase optimum sized compressor $1,323 - $1,323
12,309
kWh
- - -
04 2.7231: Use radiant heater for spot heating $10,280 $17,000 - $10,280
-
MMBtu
- -
05 2.7221: Lower temperature during the winter season and vice-versa $1,565 - - $1,565
-
MMBtu
- -
06 3.4151: Minimize water usage $2,040 $3,000 - - $1,020
-
Tgal
$1,020
TOTAL RECOMMENDED $25,891 $46,233 $12,006
98,476
kWh
$11,845
-
MMBtu
$1,020
-
Tgal
$1,020
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs