ITAC Assessment: UM0053
ITAC logo
ITAC Assessment: UM0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 150,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 2,295
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,046 1,727,433
kWh
Electricity Demand $85,998 9,807
kW-mo/yr
Natural Gas $49,227 13,008
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $244 $2,260 $165
1,758
kWh
$79
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,678 $18,091 $11,598
133,353
kWh
$2,080
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,369 $305 $2,294
26,377
kWh
$1,075
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $2,341 $1,000 $1,988
22,860
kWh
$353
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,611 $350 $3,069
35,463
kWh
$542
-
kW-mo/yr
- -
06 2.7231: Use radiant heater for spot heating $2,480 $5,100 - - $2,480
-
MMBtu
-
07 3.5311: Recover and reuse waste material $6,043 - - - - $6,043
TOTAL RECOMMENDED $31,766 $27,106 $19,114
219,811
kWh
$4,129
-
kW-mo/yr
$2,480
-
MMBtu
$6,043
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs