ITAC Assessment: UM0052
ITAC logo
ITAC Assessment: UM0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bakery Mixes
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 130,850
ft2
Annual Production 105,712,800
lb
Production Hrs. Annual 5,616
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,016 2,858,734
kWh
Electricity Demand $71,690 8,059
kW-mo/yr
Electricity Fees $11,227 -
Natural Gas $36,948 9,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,817

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $1,306 $1,433 $1,008
16,120
kWh
$298
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,928 $245 $3,102
49,238
kWh
$826
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,568 $12,455 $922
14,654
kWh
$646
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,290 $500 $1,015
16,120
kWh
$275
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,105 $500 $4,116
65,358
kWh
$989
-
kW-mo/yr
- -
06 3.1162: Use less wasteful packaging $817 - - - $400
-
lb
$417
07 3.5311: Recover and reuse waste material $4,620 $1,500 - - $(-2,310.0)
-
lb
$6,930
TOTAL RECOMMENDED $18,634 $16,633 $10,163
161,490
kWh
$3,034
-
kW-mo/yr
$(-1,910.0)
-
lb
$7,347
TOTAL IMPLEMENTED $17,817 $16,633 $10,163
161,490
kWh
$3,034
-
kW-mo/yr
$(-2,310.0)
-
lb
$6,930
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs