Assessment Year | 1996 |
---|---|
Principal Product | Bakery Mixes |
NAICS |
n/a
|
SIC | 2041: Flour and Other Grain Mill Products |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
130,850
ft2
|
Annual Production | 105,712,800
lb
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,016 | 2,858,734 |
kWh
|
$0.034 |
Electricity Demand | $71,690 | 8,059 |
kW-mo/yr
|
$8.90 |
Electricity Fees | $11,227 | - |
|
- |
Natural Gas | $36,948 | 9,029 |
MMBtu
|
$4.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,817 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,306 | $1,433 |
$1,008
16,120
kWh
|
$298
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,928 | $245 |
$3,102
49,238
kWh
|
$826
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,568 | $12,455 |
$922
14,654
kWh
|
$646
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,290 | $500 |
$1,015
16,120
kWh
|
$275
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,105 | $500 |
$4,116
65,358
kWh
|
$989
-
kW-mo/yr
|
- | - | |
06 | 3.1162: Use less wasteful packaging | $817 | - | - | - |
$400
-
lb
|
$417 | |
07 | 3.5311: Recover and reuse waste material | $4,620 | $1,500 | - | - |
$(-2,310.0)
-
lb
|
$6,930 | |
TOTAL RECOMMENDED | $18,634 | $16,633 |
$10,163
161,490
kWh
|
$3,034
-
kW-mo/yr
|
$(-1,910.0)
-
lb
|
$7,347 | ||
TOTAL IMPLEMENTED | $17,817 | $16,633 |
$10,163
161,490
kWh
|
$3,034
-
kW-mo/yr
|
$(-2,310.0)
-
lb
|
$6,930 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs