ITAC Assessment: UM0038
ITAC logo
ITAC Assessment: UM0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Polyurethane gaskets
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 175,000
ft2
Annual Production 76,500
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,046 4,768,757
kWh
Natural Gas $100,920 25,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,000 $2,200 $3,000
38,980
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,479 $20,838 $10,479
138,921
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $421 $1,500 $421
7,620
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,796 $1,000 - $1,796
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $4,447 $4,400 - $4,447
-
MMBtu
06 2.7231: Use radiant heater for spot heating $2,270 $6,800 - $2,270
-
MMBtu
TOTAL RECOMMENDED $22,413 $36,738 $13,900
185,521
kWh
$8,513
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs