ITAC Assessment: UM0037
ITAC logo
ITAC Assessment: UM0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cooper anodes
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 77,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,113 4,142,145
kWh
Natural Gas $57,917 12,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,806 $4,008 $1,806
23,447
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $771 $2,786 $771
9,965
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $286 $1,200 $286
3,810
kWh
-
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $236 $300 - $236
-
MMBtu
TOTAL RECOMMENDED $3,099 $8,294 $2,863
37,222
kWh
$236
-
MMBtu
TOTAL IMPLEMENTED $771 $2,786 $771
9,965
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs