ITAC Assessment: UM0027
ITAC logo
ITAC Assessment: UM0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Metal heat treating
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 30,000
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,176 1,618,992
kWh
Natural Gas $201,123 57,849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,047 $760 $1,047
15,533
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,609 $14,020 $6,609
97,304
kWh
-
03 2.4226: Use / purchase optimum sized compressor $1,197 $3,100 $1,197
11,723
kWh
-
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $4,636 $1,998 - $4,636
-
MMBtu
TOTAL RECOMMENDED $13,489 $19,878 $8,853
124,560
kWh
$4,636
-
MMBtu
TOTAL IMPLEMENTED $8,853 $17,880 $8,853
124,560
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs