ITAC Assessment: UM0017
ITAC logo
ITAC Assessment: UM0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Machined, purified and coated graphite products
NAICS
n/a
SIC 3624: Carbon and Graphite Products
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,115 4,697,245
kWh
Natural Gas $27,009 6,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,369 $1,100 $1,369
26,964
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,281 $16,346 $7,281
155,920
kWh
-
03 2.4226: Use / purchase optimum sized compressor $1,994 $35 $1,994
38,980
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,199 $4,680 $3,199
62,720
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $4,232 - $305
5,862
kWh
$3,927
-
MMBtu
06 2.7496: Install partitions to reduce size of conditioned space $3,090 $2,500 $3,090
60,668
kWh
-
TOTAL RECOMMENDED $21,165 $24,661 $17,238
351,114
kWh
$3,927
-
MMBtu
TOTAL IMPLEMENTED $12,882 $17,446 $8,955
188,746
kWh
$3,927
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs