ITAC Assessment: UM0016
ITAC logo
ITAC Assessment: UM0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Meat, Poultry Refrigerated Storage and Processing
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,641 2,194,314
kWh
Natural Gas $25,958 4,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $536 $462 $536
7,034
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,210 $15,700 $6,210
81,770
kWh
03 2.2621: Modify refrigeration system to operate at a lower pressure $8,760 $530 $8,760
115,475
kWh
04 2.7261: Install timers and/or thermostats $2,530 $460 $2,530
33,411
kWh
TOTAL RECOMMENDED $18,036 $17,152 $18,036
237,690
kWh
TOTAL IMPLEMENTED $18,036 $17,152 $18,036
237,690
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs