ITAC Assessment: UM0015
ITAC logo
ITAC Assessment: UM0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pickling and slitting
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 600,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $312,215 117,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $12,087 $19,430 - $12,087
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,226 $15,513 - $11,226
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $4,498 $16,200 - $4,498
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,000 - $5,000
-
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $413 $350 - $413
-
MMBtu
TOTAL RECOMMENDED $33,224 $51,493 $5,000
-
kWh
$28,224
-
MMBtu
TOTAL IMPLEMENTED $32,811 $51,143 $5,000
-
kWh
$27,811
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs