| Assessment Year | 2003 |
|---|---|
| Principal Product | Cardboard sheets |
| NAICS | 322130: Paperboard Mills |
| SIC | 2631: Paperboard Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 25 |
| Plant Area |
68,706
ft2
|
| Annual Production | 500,000
thousand feet
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $159,745 | 2,282,070 |
kWh
|
$0.070 |
| Natural Gas | $234,247 | 40,121 |
MMBtu
|
$5.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $98,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,605 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $1,444 | $513 | - |
$1,444
-
MMBtu
|
- | |
| 02 | 2.2113: Repair or replace steam traps | $1,282 | $57 | - |
$1,282
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $49,692 | $22,500 | - |
$49,692
-
MMBtu
|
- | |
| 04 | 2.1241: Reduce excessive boiler blowdown | $6,768 | $4,500 | - |
$6,768
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $943 | $1,792 |
$943
13,471
kWh
|
- | - | |
| 06 | 3.4155: Meter waste water | $36,908 | $1,950 | - | - |
$36,908
-
Tgal
|
|
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $971 | $258 |
$971
13,864
kWh
|
- | - | |
| TOTAL RECOMMENDED | $98,008 | $31,570 |
$1,914
27,335
kWh
|
$59,186
-
MMBtu
|
$36,908
-
Tgal
|
||
| TOTAL IMPLEMENTED | $40,605 | $2,778 |
$971
13,864
kWh
|
$2,726
-
MMBtu
|
$36,908
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs