ITAC Assessment: MI0060
ITAC logo
ITAC Assessment: MI0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Cardboard sheets
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 68,706
ft2
Annual Production 500,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,745 2,282,070
kWh
Natural Gas $234,247 40,121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2136: Install / repair insulation on steam lines $1,444 $513 - $1,444
-
MMBtu
-
02 2.2113: Repair or replace steam traps $1,282 $57 - $1,282
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $49,692 $22,500 - $49,692
-
MMBtu
-
04 2.1241: Reduce excessive boiler blowdown $6,768 $4,500 - $6,768
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $943 $1,792 $943
13,471
kWh
- -
06 3.4155: Meter waste water $36,908 $1,950 - - $36,908
-
Tgal
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $971 $258 $971
13,864
kWh
- -
TOTAL RECOMMENDED $98,008 $31,570 $1,914
27,335
kWh
$59,186
-
MMBtu
$36,908
-
Tgal
TOTAL IMPLEMENTED $40,605 $2,778 $971
13,864
kWh
$2,726
-
MMBtu
$36,908
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs