ITAC Assessment: SF0410
ITAC logo
ITAC Assessment: SF0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Recycled Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 73
Plant Area 1,600,000
ft2
Annual Production 4,745,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,603,536 12,127,200
kWh
Electricity Demand $363,139 20,174
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $675,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $675,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7224: Reduce space conditioning during non-working hours $33,835 - $33,835
157,826
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,290 $129 $1,058
4,925
kWh
$232
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $11,966 $1,452 $9,814
45,710
kWh
$2,152
-
kW-mo/yr
-
04 2.5123: Reduce fluid flow rates $20,646 $4,715 $18,519
86,256
kWh
$2,127
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $156,563 $70,219 $140,435
654,099
kWh
$16,128
-
kW-mo/yr
-
06 2.5123: Reduce fluid flow rates $41,557 $33,080 $37,276
173,617
kWh
$4,281
-
kW-mo/yr
-
07 2.4131: Size electric motors for peak operating efficiency $121,698 $165,923 $109,162
508,437
kWh
$12,536
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $86,008 $156,543 $71,362
332,382
kWh
$8,999
-
kW-mo/yr
$5,647
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $178,304 $353,108 $153,402
714,493
kWh
$24,902
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $24,022 $71,940 $21,433
99,829
kWh
$2,589
-
kW-mo/yr
-
TOTAL RECOMMENDED $675,889 $857,109 $596,296
2,777,574
kWh
$73,946
-
kW-mo/yr
$5,647
TOTAL IMPLEMENTED $675,889 $857,109 $596,296
2,777,574
kWh
$73,946
-
kW-mo/yr
$5,647
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs