ITAC Assessment: UD0977
ITAC logo
ITAC Assessment: UD0977
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Powertrain, Balance Shaft Components
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 141
Plant Area 106,000
ft2
Annual Production 48,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $913,175 9,471,468
kWh
Natural Gas $7,513 1,188
MMBtu
TOTAL YEARLY COSTS $920,688
RECOMMENDED SAVINGS* $152,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,668

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $12,684 $6,500 $12,684
131,574
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $9,960 - $9,960
103,320
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,231 - $9,231
95,760
kWh
- -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $47,239 $23,800 $47,239
490,031
kWh
- -
05 2.7241: Install outside air damper / economizer on hvac unit $34,880 - $34,880
361,829
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $16,048 $2,000 $16,048
166,472
kWh
- -
07 2.3212: Optimize plant power factor $3,320 $6,000 - $3,320 -
08 2.7131: Add area lighting switches $745 - $684
7,096
kWh
- $61
09 2.7142: Utilize higher efficiency lamps and/or ballasts $18,687 $57,949 $11,418
118,444
kWh
- $7,269
TOTAL RECOMMENDED $152,794 $96,249 $142,144
1,474,526
kWh
$3,320 $7,330
TOTAL IMPLEMENTED $48,668 $8,500 $48,607
504,222
kWh
- $61
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs