| Assessment Year | 2017 |
|---|---|
| Principal Product | Powertrain, Balance Shaft Components |
| NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 141 |
| Plant Area |
106,000
ft2
|
| Annual Production | 48,000
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $913,175 | 9,471,468 |
kWh
|
$0.096 |
| Natural Gas | $7,513 | 1,188 |
MMBtu
|
$6.32 |
| TOTAL YEARLY COSTS | $920,688 | |||
| RECOMMENDED SAVINGS* | $152,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $48,668 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $12,684 | $6,500 |
$12,684
131,574
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,960 | - |
$9,960
103,320
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,231 | - |
$9,231
95,760
kWh
|
- | - | |
| 04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $47,239 | $23,800 |
$47,239
490,031
kWh
|
- | - | |
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $34,880 | - |
$34,880
361,829
kWh
|
- | - | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $16,048 | $2,000 |
$16,048
166,472
kWh
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $3,320 | $6,000 | - | $3,320 | - | |
| 08 | 2.7131: Add area lighting switches | $745 | - |
$684
7,096
kWh
|
- | $61 | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,687 | $57,949 |
$11,418
118,444
kWh
|
- | $7,269 | |
| TOTAL RECOMMENDED | $152,794 | $96,249 |
$142,144
1,474,526
kWh
|
$3,320 | $7,330 | ||
| TOTAL IMPLEMENTED | $48,668 | $8,500 |
$48,607
504,222
kWh
|
- | $61 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs