ITAC Assessment: UM0014
ITAC logo
ITAC Assessment: UM0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pickling and slitting
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 190,000
ft2
Annual Production 600,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $307,796 114,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $9,126 $13,020 - $9,126
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,031 $7,886 - $3,031
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $497 $1,000 - $497
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,000 - $5,000
-
kWh
-
05 2.2136: Install / repair insulation on steam lines $624 $189 - $624
-
MMBtu
TOTAL RECOMMENDED $18,278 $22,095 $5,000
-
kWh
$13,278
-
MMBtu
TOTAL IMPLEMENTED $17,781 $21,095 $5,000
-
kWh
$12,781
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs