Assessment Year | 1994 |
---|---|
Principal Product | Zinc Alloys and anodes |
NAICS |
n/a
|
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
75,000
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,058 | 798,066 |
kWh
|
$0.10 |
Natural Gas | $188,928 | 60,230 |
MMBtu
|
$3.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,640 | $2,810 | n/a |
$4,640
45,135
kWh
|
- |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,992 | $4,523 | n/a |
$2,992
29,015
kWh
|
- |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $949 | $350 | n/a |
$949
9,379
kWh
|
- |
04 | 2.4221: Install compressor air intakes in coolest locations | $163 | - | n/a |
$163
4,396
kWh
|
- |
05 | 2.4226: Use / purchase optimum sized compressor | $612 | $3,100 | n/a |
$612
5,862
kWh
|
- |
06 | 2.2514: Cover open tanks | $3,577 | $4,000 | n/a | - |
$3,577
-
MMBtu
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $7,836 | $5,735 | n/a | - |
$7,836
-
MMBtu
|
TOTAL RECOMMENDED | $20,769 | $20,518 |
$9,356
93,787
kWh
|
$11,413
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs