| Assessment Year | 1994 |
|---|---|
| Principal Product | Zinc Alloys and anodes |
| NAICS |
n/a
|
| SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
75,000
ft2
|
| Annual Production | 36,000,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $82,058 | 798,066 |
kWh
|
$0.10 |
| Natural Gas | $188,928 | 60,230 |
MMBtu
|
$3.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,769 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $4,640 | $2,810 | n/a |
$4,640
45,135
kWh
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,992 | $4,523 | n/a |
$2,992
29,015
kWh
|
- |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $949 | $350 | n/a |
$949
9,379
kWh
|
- |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $163 | - | n/a |
$163
4,396
kWh
|
- |
| 05 | 2.4226: Use / purchase optimum sized compressor | $612 | $3,100 | n/a |
$612
5,862
kWh
|
- |
| 06 | 2.2514: Cover open tanks | $3,577 | $4,000 | n/a | - |
$3,577
-
MMBtu
|
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $7,836 | $5,735 | n/a | - |
$7,836
-
MMBtu
|
| TOTAL RECOMMENDED | $20,769 | $20,518 |
$9,356
93,787
kWh
|
$11,413
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs