ITAC Assessment: UM0011
ITAC logo
ITAC Assessment: UM0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Zinc Alloys and anodes
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 75,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,058 798,066
kWh
Natural Gas $188,928 60,230
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,640 $2,810 n/a $4,640
45,135
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,992 $4,523 n/a $2,992
29,015
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $949 $350 n/a $949
9,379
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $163 - n/a $163
4,396
kWh
-
05 2.4226: Use / purchase optimum sized compressor $612 $3,100 n/a $612
5,862
kWh
-
06 2.2514: Cover open tanks $3,577 $4,000 n/a - $3,577
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $7,836 $5,735 n/a - $7,836
-
MMBtu
TOTAL RECOMMENDED $20,769 $20,518 $9,356
93,787
kWh
$11,413
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs